Suppliers Wholesale Hot Sale Stainless Steel Carbon Steel Link Chain

Suppliers Wholesale Hot Sale Stainless Steel Carbon Steel Link Chain

HangCZPT Supplier Lifting Loaded G80 Chain for Chain CZPT

SpecificationsButt Welding Chain: 2mm-13mm chains2. Content: 20Mn2 or 25Mnv3. SEMI-Automated creation machinesIntroduction of G80 Butt Welding Chain: one. We are an skilled manufacturing facility to manufacture website link chains for 20 years2. The chain grade consists of G80, G70, G60, G43, G30 and so on. three. Surface area treatment: Self colour, blackened, painted, electro galvanized, scorching DIP galvanized, painted and many others. 4. We can make the load chains according to Nationwide CZPT, German CZPT,  The CZPT chain is also welcomed6. CZPT: Nationwide CZPT (GB/T20947-2007), CZPT CZPT (ISO3077-2001), American CZPT (NACM, ASTM), CZPTpean CZPT 

Dimensions Inside Size Outside the house WIDTH Excess weight For each 100M Operating LOAD BREAKING LOAD Quality
MM MM MM KG N N
2 twelve eight 7 five hundred 1250 A
22 6 C
two.five fourteen 10 eleven 750 2000 A
24 10 C
three sixteen twelve sixteen.5 1120 2800 A
26 fifteen C
three.five eighteen 14 22.5 1500 3850 A
28 20 C
4 19 sixteen 30 2000 5000 A
32 27 C
4.five 20 eighteen 39.five 2500 6300 A
34 35 C
5 21 20 50 3150 7750 A
35 43 C
5.five 23 22 60.5 3800 9500 A
38.five fifty two C
six 24 24 seventy three 4500 11500 A
forty two 63 C
6.5 26 26 86 5400 13500 A
forty five.5 seventy four C
seven 28 28 a hundred 6000 15000 A
49 86 C
8 32 32 one hundred thirty 8000 20000 A
fifty two one hundred ten C
eight.five 34 34 149 9000 22500 A
fifty six one hundred twenty five C
9 36 36 165 ten thousand 25000 A
fifty nine 141 C
ten forty 40 205 12500 31000 A
65 175 C
eleven forty four 44 250 15000 38000 A
seventy two 211 C
12 48 forty eight 290 18000 45000 A
78 255 C
13 fifty two fifty two 345 21200 53000 A
eighty two 295 C

Payment

Payment time period L/C                         l/c volume earlier mentioned forty.000 usd,we can acknowledge L/C at sight
 
 
 T/T
 
EXW  30% T/T in advance,paid the equilibrium prior to shipment
 
 FOB
 CIF  30% T/T in advance,compensated the equilibrium in opposition to copy  of B/L
 
 cfr(c&f)
 paypal   amount reduced than 4000usd
  
 west

 

Supply time 15~35days following getting payment for one particular container

 

We welcome use trade assurance,you`ll get pleasure from:
one hundred% solution quality protection
a hundred% on-time shipment security
a hundred% payment protection for your coated sum

 

Suppliers Wholesale Hot Sale Stainless Steel Carbon Steel Link Chain

Tags:

cast chain

As one of leading cast chain manufacturers, suppliers and exporters of products, We offer cast chain and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of cast chain

Recent Posts