Automatic Small Pet Bottle Fruit Juice Hot Filling Production Machine

Automatic Small Pet Bottle Fruit Juice Hot Filling Production Machine

Automatic Tiny Pet Bottle Fruit Juice Hot Filling Creation Equipment

Characteristis:

Direct link technology in between air conveyor and in-feeding starwheel is used to substitute in-feeding screw and conveying chain to relieve bottle altering process with only to adjust few areas. Freshly-made bottle-separating grippers are assembled to starwheel.
Neck-hanging technological innovation is used in bottle transportation. Instead of conventional starwheel, we use neck-hanging gripper to make bottle-dimensions-changing simply, CZPT products height adjustment, only number of areas want to be altered
Specifically-created rinser grippers which are made of stainless steel are firm and endurable, with no contact to screw component of the bottle to avert 2nd pollution.
Substantial-speed, easily-cleaned filling valves with large stream quantity are geared up with effectively CIP system and control system to rinse the equipment throughly.
Splint of starwheel utilizing twist descending way to simplify the procedure of bottle-dimension-changing. Only need to modify arch board and starwheel, inside 10 minutes.
The machine applies to the creation of tea, juice and useful drinks

Equipment Parametre

Model CGFR12-12-six CGFR18-eighteen-six CGFR24-24-eight CGFR32-32-ten CGFR40-40-ten CGFR50-fifty-twelve
Washing No twelve eighteen 24 32 forty 50
Filling No twelve eighteen 24 32 40 50
Capping No 6 six 8 10 12 12
Creation potential(500ml b/h) 4000 7000-8000 10000-12000 12000-15000 15000-18000 20000-22000
Put in Capacity(kw) three.5 four four.eight seven.6 eight.three 9.six
General dimension 2450*1800*2400 2650*1900*2400 2900*2100*2400 4100*2400*2400 4550*2650*2400 5450*3210*2400

Comprehensive Images

Rinser 
-Rotative rinsing turret 1 therapy, fastened nozzles, with grippers.
-The grippers take the bottles from the inlet star-wheel whilst they are still pushed by the star-wheel, thus guaranteeing a protected grip.
-Right after the gripping, the bottle is turned upside down and cantred above a spraying nozzle which directs a stream of rinse h2o into the bottle. Soon after the draining period the bottle is turned over to an upright position yet again.
 

Filler
-The star-wheels push the bottles usually “by the neck” via the rinsing, filling and capping actions. For the a variety of kinds of bottle, it is effortless to adjust the structure for the operator by our specialised design.
-Solution bowl is to minimize the reduction of heat.
-If the temperature is reduced than the environment value, the filling valves will quit and return the very last beverage in filling valve to recycle tank and return to UHT again to sterilize with pump.
 

Capper 
-Rotative capping turret, appropriate to the software of screw plastic caps on PET bottles
-The set portion is composed of the cap hopper, the cap feeder with appropriate motor and the cam actuating the capping heads.
-The heads are raised and decreased by the action of a follower that is using on a formed cam.

Positive aspects
one). Complete filling to steer clear of the liquid level from sinking soon after the bottle cooling down, and to lessen the dissolved oxygen to the utmost extent.
2). Reasonable structured storage hopper and content source technique make the materials in consistent flow velocity, continuous pressure CZPT frothing. Usually substantial placement tank is adopted.
three). The storage hopper has the characteristic of gas discharge, full sealing and temperature detecting. In moderate and large speed generation line, the material distributor replaces the big liquid tank to realize the comprehensive CIP.
four). Sanitary filling head system is of umbrella framework, large filling pace.
5). Best filling temperature handle technique.
6). Reflux tank system has the perform of providing the content immediately.
7). Perfect CIP system.

                                                                                                                             
Services:
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge) local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination) accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
two. Translator
If translator is required and can’t be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms

one. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, HangCZPTdling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part’s manufacturer or our company.
 
two. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also acknowledge L/C payment, 30% down payment, and 70% L/C at sight

FAQ:
1) Can your manufacturing unit give the whole plant from A to Z?
A: Of course, we can supply the total plant, from bottling making plant, h2o purification plant, to filling packing plant. 

2) Are all machinery your factory created? 
A: Our manufacturing unit make the h2o purification and filling packing crops.  We do not make the bottle producing equipment, 
we have excellent high quality bottle generating equipment associate, and we supply to buyer identical extended warranty time and great soon after services.
 
3) How can I know the machinery high quality just before I order? 
A: Frist, we will invite you browsing our manufacturing facility to check out the devices quality, and present the devices operating for you in our manufacturing facility. 

four)What certificates you can give?
A: Our manufacturing facility supply the CE, SGS, ISO, and accroding to some nations around the world, we also can supply the Pvoc, Coc, Soncap…ect 

five)Can your manufacturing unit make the bottle drawing, workshop layout, and labels for us? 
A: We can assist buyers design their very own bottle shape, workshop structure and label drawings, these positions are free demand. (Workshop want customer to provide the size of manufacturing facility) 

6)Set up and Instruction Time
A: We have expert engineer for oversea installaion and coaching, they can speak English, and have much encounter oversea perform.

Speak to Us
Please truly feel free of charge to contact us!
HangCZPT CZPT CZPT CO.,LTD
 

Automatic Small Pet Bottle Fruit Juice Hot Filling Production Machine

Tags:

cast chain

As one of leading cast chain manufacturers, suppliers and exporters of products, We offer cast chain and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of cast chain

Recent Posts